1982 Sunline 15′ Travel Trailer – Day Two Demolition

Today I removed the interior wall and ceiling sheathing. Removed the Ceiling mount A/C unit , floor furnace, electric converter, window trims and did some serious Sawzall detail work, hahaha. The floor is next and drop the gray and black water tanks. Then I can START building; new wire, floor sheathing, walls and ceilings, fixtures, appliances, seating, etc.


Leave a Reply

Your email address will not be published. Required fields are marked *

Featured Prints

Uncategorized

Sun Skipper

$75.00$499.00

Uncategorized

Masonboro Mirror

$75.00$999.00

Uncategorized

Pier Pincher

$75.00$999.00

Uncategorized

God’s Glory

$75.00$499.00

Uncategorized

Head Dip

$75.00$499.00

Uncategorized

Underwater Oasis

$75.00$499.00

Uncategorized

Summer Shimmer

$75.00$499.00

Uncategorized

Under the Lip

$75.00$499.00